Applications

Every kind of tough water job.

Heartwork pipelines have moved sand, slurry and process water on six continents. Here are the environments we design for — filter by sector or scroll to the case studies below.

40+
Countries served
120+
Active projects
6
Continents
24 h
Quote turnaround
By Sector

Where our pipelines go to work

Port & Waterway DredgingMarine

Port & Waterway Dredging

Suction and discharge lines for cutter-suction dredgers deepening approach channels, turning basins and shipping lanes.

  • DN500–DN1200 discharge
  • Steel-cord suction hose
  • Flanged rigid sections
Discuss This Application
Land ReclamationCoastal

Land Reclamation

Floating and bottom-laid pipelines pumping sand and slurry across kilometers of open water for new coastline formation.

  • Km-scale floating trains
  • Bolt-on HDPE floaters
  • Field butt-fusion
Discuss This Application
Mining Slurry TransportAbrasive

Mining Slurry Transport

High-abrasion rubber and UHMWPE lines carrying tailings, iron concentrate and coal slurry from pit to processing plant.

  • UHMWPE wear liner
  • Reinforced NR compound
  • Wear-monitoring ports
Discuss This Application
Hydropower & River WorksInland

Hydropower & River Works

River and reservoir desilting pipelines that keep hydropower intakes and irrigation canals productive year-round.

  • Silt discharge lines
  • Bank-anchored HDPE
  • Seasonal deployment
Discuss This Application
AquacultureWater

Aquaculture

Marine-grade HDPE pipe and floater arrays for offshore fish farming and coastal shrimp operations.

  • Cage-frame HDPE
  • UV-stable floats
  • Salt-water rated
Discuss This Application
Municipal & IndustrialUtility

Municipal & Industrial

Long-distance HDPE mains for stormwater discharge, industrial cooling and desalination brine lines.

  • PE100 pressure pipe
  • Chemical resistant
  • 40+ yr service life
Discuss This Application
Case Studies

Real jobs. Real numbers.

Deep-water port reclamation
Southeast Asia

Deep-water port reclamation

8.4 km
Floating pipeline delivered

Cutter-suction dredger discharge line with modular HDPE floats — commissioned in 11 weeks.

Iron-ore tailings transport
West Africa

Iron-ore tailings transport

22,000 m
Steel-cord rubber hose

Multi-year supply of DN400 abrasion-resistant hose for a copper-iron mine slurry loop.

Desalination brine outfall
Middle East

Desalination brine outfall

DN 1200
PE100 HDPE main

Butt-fused offshore brine discharge with concrete weight coating and marker buoys.

River channel maintenance
Latin America

River channel maintenance

40+ km
Floater train yearly

Recurring seasonal supply of HDPE floats for an inland waterway dredging fleet.

Deployment Flow

From brief to bubbles on the water

01
Site brief

Share your bathymetry, distance, media, and pumping curve — we handle the sizing.

02
Engineered spec

You get a stamped drawing set: diameter, wall, floater pitch, anchor plan.

03
Factory build

Batched production with hydrostatic, adhesion and buoyancy tests on every unit.

04
Deployment support

Loading plans, on-site fusion support, and spare-parts kits shipped with the line.

Typical lead time from signed PO to shipment: 25 – 45 days.
FAQ

Common questions about deploying with us

Rubber hose DN100–DN1200, HDPE dredge pipe DN200–DN1600, UHMWPE wear pipe DN50–DN800, and matching HDPE pipe floaters for the full range. Non-standard sizes are quoted on request.

Standard rubber hose ships in 25–35 days from PO; HDPE pipe and floaters in 20–30 days. Complex custom builds (jumbo diameter, special compounds) run 45–60 days. Expedited slots are available with prior booking.

Yes. Our engineering desk sizes hose ID, wall thickness, floater buoyancy, anchor spacing and jointing based on your pumping curve and site data. You receive a stamped drawing set with the quote.

Every batch carries mill certificates: hydrostatic test, wall gauging, ply adhesion, and buoyancy check. Third-party inspection (SGS, BV, TÜV) is available on request and can be witnessed at the factory.

Both. Standard DN diameters ship in 40'HQ containers; oversize sections load on open-top or flat-rack. We handle FOB Qingdao / Shanghai / Ningbo and can arrange door-to-port logistics.

For strategic projects we send experienced field engineers to supervise butt-fusion, floater installation, and commissioning. Travel plus per-diem terms are quoted separately.

Have a job we haven't listed?

Every project is unique. Ours are always custom.